(一)試車:
水泵在安裝完畢后,必須試車,其目的:
1、
使各種配合部分運(yùn)轉(zhuǎn)協(xié)調(diào)。
2、
檢查和消除安裝中的毛病。
3、
檢查水泵的轉(zhuǎn)向是否符合要求
I.
Test Run
Do test run
after installation for the following purp
1.Make all
parts cooperate well.
2.Check and
remove the problems during the installation.
3.Check the
diversion of pump if it is up to the mustard.
3、水泵出水量不足
The waer yield
of water is not enough
1、進(jìn)水管路或葉輪有水草雜物
2、轉(zhuǎn)速過低
3、輸水高度過高
4、泵蓋及葉輪磨損間隙過大
5、填料進(jìn)氣
6、馬力不足
7、進(jìn)水管口插入水中深度不夠
1. There are waterweeds and sundries in
inlet pipes or impeller
2.The rotate speed is too low
3.Water delivery height is too high
4.The attrition gap between pump cover
and impeller is too large
5.The padding is air in
6.The horsepower is not engough
7.The depth of inlet pipe under water is
not enough
1、清除水草雜物
2、調(diào)整轉(zhuǎn)數(shù)
3、降低輸水高度
4、用紙墊調(diào)整間隙至正常
5、壓緊或更換填料
6、加大馬力
7、增加插入水中深度至一米左右
1.Clear the waterweeds and sundries
2.Ajust the rotate speed
3.Reduce the water delivery height
4.Add paper washers to adjust the gaps
5.Compact or change padding
6.Increase the horsepower
7.Make the depth of inlet pipe under
water to one meter